Resources

Hybrid Green Power with Senmarck Battle Tested PowerMore-PDE250 Model!

Hybrid green power with Senmarck Energy's battle tested PowerMore-PDE250 Model!

Recently Senmarck delivered Shanghai construction drilling project with one downsized diesel generator 360kW and Senmarck 250kW power converter+153kWh lithium battery power to satisfy more than 300kW inductive load on site.


1.jpg


We are revitalizing traditional diesel generator efficiency and sustainability in the construction industry. More importantly reduced more than 60% of the construction power costs. Most of the day, the operation power comes from the battery system.


Reasons to use Senmarck PowerMore hybrid BESS for your green power and energy cost saving solution:


Satisfy strong inductive motor loads, meet peak power demand.
Hybrid BESS overloading capability and reduce diesel generator capacity, lower CAPEX     and generator maintenance costs
Reduce diesel fuel consumption and CO2 emissions.

Uninterrupted power, seamless switch between gensets and hybrid battery system.
Flexible work modes options – generator priority, hybrid battery system work priority,   or grid supply priority and hybrid system as power backup.
Mobile and compact design, plug and play.

Besides remote monitoring, notifications, and emails alarms for instant alerts are available!
Choose senmarck to speed up green energy transition and energy costs saving for your rental business!
   


4 2.jpg