How to Solve the Issue of Heavy Machine Motors Surging Power with Battery Storage System?

Have you noticed the issue of heavy machine motors surging power? Sometimes, the surge power can reach 3 to 4 times its rated current for very short running times. SENMARCK ENERGY has designed the PowerMore ™ hybrid system, which can sustain 2 to 4 times overloading capability. So no need oversize the hashtagdiesel generators anymore! 


6b894aa30a43900fca70139a73ddc8a9 - 副本.png
How do we achieve this?
We conduct tests in our lab using different loads before shipping our systems to sites.
For example, we use a 132 kW inductor load, a 500 kW resistive load, and other variable loads for testing with the hybrid system.
✅ Additionally, we perform synchronization tests with various brands of diesel generators for hybrid use.
✅The Deepsea controllers listed below have been tested and are fully compatible with our hybrid battery systems:
DSE335 Modbus,DSE4620 Modbus, DSE5510 Modbus, DSE6020 Modbus, DSE6120 Modbus, DSE7310 MKII Modbus, DSE7320 Modbus, DSE7410 Modbus, DSE7420 Modbus, DSE7510 Modbus, DSE7520 Modbus, DSE7560 Modbus, DSE8610 Modbus, DSE8620 Modbus, DSE8660 MKIl Modbus, DSE8680 Modbus.

Synchronize Gensets Test.png

500kW Resistive Load.png