Off-grid Hybrid Diesel Energy Storage System Installed In Guangzhou

24.jpg

300KVA diesel generator hybridized with SENMARCK 250KW/140KWH PowerMore energy storage system was installed in Guangzhou highway construction sites. The new systems saves 54% less fuel consumption and

65% fewer operating hours.


The construction site used to equip 600KVA to 800KVA diesel generators to power all the pile drivers and concrete mixers, and whole site offices. The high fuel costs and unbearable diesel engine noise make site work not attractive. SENMARCK PowerMore hybrid diesel energy storage systems offered below benefits,


• A decrease in diesel consumption, especially in a remote construction field, where fuel supplies are hard to come by or transportation logistics are expensive.


• Enhanced genset work effectiveness


• Greater power supply dependability


• Emissions reduction


• A decrease in noise