News

Revolutionize Tower Crane Operations: Cut Diesel Costs by 70% with Senmarck's Hybrid BESS Solution


Revolutionize Tower Crane Operations: Cut Diesel Costs by 70% with Senmarck’s Hybrid BESS Solution

For last six years, Senmarck has been producing and supporting local construction companies to save fuel costs for their off-grid operations. There are additional Benefits of Senmarck’s Hybrid Diesel-BESS System:

  1. Massive Fuel Savings (Up to 70% Reduction) – By reducing diesel generator runtime from 12-16 hours to just 3-4 hours, construction sites save thousands in fuel costs annually. 

  2. Lower CO Emissions & Environmental Compliance – Fewer running hours mean significantly reduced carbon footprint, helping companies meet sustainability goals and regulatory standards.

  3. Reduced Generator Wear & Maintenance Costs – Running generators at optimal load for shorter periods extends their lifespan and cuts maintenance expenses.

  4. Silent & Cleaner Construction Sites – Battery storage operates noise-free, reducing noise pollution in urban areas and improving worker conditions.

  5. Peak Load Handling Without Over-Sizing Generators – The hybrid system absorbs power surges, eliminating the need for oversized, inefficient generators.

  6. Energy Resilience & Backup Power – Ensures uninterrupted crane operation even during generator refueling or maintenance.

  7. Fast ROI (Return on Investment) – Fuel and maintenance savings typically pay back the system cost within a short period.

  8. Scalable for Multiple Cranes & Equipment – The system can be expanded to support other high-power construction machinery.

"Upgrade to Senmarck’s Hybrid BESS today and transform your construction site into a cost-efficient, eco-friendly powerhouse—where cranes lift more, diesel burns less, and profits soar!"

Would you like any refinements for specific audiences (contractors, sustainability officers, etc.)? You can send email to sales@senmarck.com for more details.